Lindapter Hollo-Bolts provided a solution for securing an architectural glass prism façade in Milan.
Location: Milan, Italy
Market: Façades & Cladding
Product: Hollo-Bolt® by Lindapter
Quantity: 6,800
Contractor: MAP Carpenteria
The Isola district of Milan has recently undergone a major transformation, making it one of the most attractive areas of the city. Due to the prime location of De Castillia 23 and its excellent transport links, Gruppo Unipol decided to renovate the building and occupy it as their headquarters.
Unipol wanted to create an innovative, contemporary building in keeping with the area. The restoration work aimed to completely change the building’s aesthetic features, but also to improve its functionality, energy performance and the overall efficiency of the building’s management.
The architects, Progetto CMR, proposed an unusual glass prism façade design, aimed at reflecting sunlight in a constantly different way. This required a method of connecting the glass support brackets to the hollow tubular sections forming the façade.
The structural engineer for this project decided to specify the Flush Fit Hollo-Bolt by Lindapter, an expansion bolt that requires access to only one side of a Hollow Structural Section (HSS).
Hollo-Bolt was chosen as it offered significant benefits including fast installation, high strength capacity, clean visual finish, and a range of independent technical accreditations, which include the CE mark and ETA to achieve a design compliant with Eurocode 3.
The main contractor MAP Carpenteria used a total of 6,800 size 5/16" Hollo-Bolts to connect the glass support brackets to the façade framework of two buildings. Installation was quick and easy as each bolt is simply inserted into pre-drilled holes and tightened with a torque wrench to recommended tightening torque to provide the necessary clamping force. The brackets then securely held each glass panel in the required position to create the elegant façade.
The specification of Hollo-Bolts provided an approved connection design compliant with Eurocode 3 that met the structural engineers requirements.
Hollo-Bolts also provided a clean architectural appearance, due to the flush fit head type, and excellent corrosion protection thanks to the zinc plated finish.
Want to find out more about this product?
Watch the
installation video
How can we
help you?
Reasons to choose Lindapter
Save time and money
Clamping two steel sections together avoids time-consuming welding or conventional drilling and bolting.
Safer connections
Drilling and welding in the field is avoided, removing the need for hot work permits and encouraging safer site conditions.
High strength
Lindapter clamps are manufactured from high strength materials to resist high load requirements and harsh environments.
Industry leading approvals
Lindapter has earned a reputation synonymous with safety and reliability, gaining multiple independent approvals.
Adjustable
Quickly align steel sections by sliding the section into the correct position before tightening the Girder Clamp to complete the installation.
Free connection detailing
Lindapter’s experienced Engineers can detail a custom connection based on your specific requirements free of charge.
You must have a Lindapter account to access this content
Log in to your account
Register for an account
Don't have an account?
Click here to registerAlready registered?
If you have registered for an account but have not received your confirmation email, please click here to resend.
Headquarters
Lindapter Internationalnews