Lindapter Hollo-Bolts were used to quickly connect 257 modular rooms together.
Location: Edinburgh, UK
Market: Modular & Offsite Construction
Product: Hollo-Bolt by Lindapter
Client: Prestige Student Living
Project Team: Clark Contracts, DMD Modular, Frontier Modular Services and Meinhardt
Prestige Student Living identified a shortage of Purpose-Built Student Accommodation (PBSA) in Edinburgh and decided to submit plans for two five-story student accommodation buildings. The buildings would serve the Kings Building Campus, owned by Edinburgh University, and provide a comfortable living experience with high quality amenities for students arriving for the start of the 2022 academic year.
It was crucial that the project was completed within the specified timeframe and so a modular construction technique was the preferred option. The design and specification of the buildings also had to incorporate a variety of environmentally friendly materials, aligning with the project's strong Environmental, Social, and Governance (ESG) credentials.
There was a requirement for a quick, convenient and recyclable connection from one side of the modular units to ensure increased speed of installation while maintaining environmental and sustainability standards.
Using the most advanced modular 3D technology, 257 modular units were to be manufactured offsite in Poland and transported to the construction site in Edinburgh. Hollo-Bolt, the original expansion bolt from Lindapter was specified for connecting the modules together in the field, using pre-drilled steel plates and angle brackets, due to its versatility including speed of installation from one side and its design for de-construction credentials.
Installation was quick and easy, each modular unit was lifted by crane and carefully stacked on top of each other and connected using Hollo-Bolts inserted through the steel plates and angle brackets into pre-drilled holes of the modular units. Each Hollo-Bolt was installed using a torque wrench to provide the necessary clamping force.
Countersunk head Hollo-Bolts, size 5/8” were used on the bracket interface between the steel modular units and concrete lift core, while Hexagonal Head Hollo-Bolts, size 3/4” were used in conjunction with pre-drilled plates to fix modules in the vertical plane. Additionally, countersunk head Hollo-Bolts, were selected to secure horizontal floor plates to attach the modules horizontally with minimal bolt head protrusion.
Hollo-Bolts along with the modular construction technique facilitated the fast construction of the first five-story student accommodation building allowing the project to be completed on time.
The widespread adoption of Hollo-Bolt for connecting modular buildings demonstrates how Lindapter's expansion bolt streamlines construction by eliminating the necessity for labor-intensive and costly on-site processes like welding, cutting, or through-bolting.
Want to find out more about this case study?
Watch the
project video
How can we
help you?
Reasons to choose Lindapter
Save time and money
Clamping two steel sections together avoids time-consuming welding or conventional drilling and bolting.
Safer connections
Drilling and welding in the field is avoided, removing the need for hot work permits and encouraging safer site conditions.
High strength
Lindapter clamps are manufactured from high strength materials to resist high load requirements and harsh environments.
Industry leading approvals
Lindapter has earned a reputation synonymous with safety and reliability, gaining multiple independent approvals.
Adjustable
Quickly align steel sections by sliding the section into the correct position before tightening the Girder Clamp to complete the installation.
Free connection detailing
Lindapter’s experienced Engineers can detail a custom connection based on your specific requirements free of charge.
You must have a Lindapter account to access this content
Log in to your account
Register for an account
Don't have an account?
Click here to registerAlready registered?
If you have registered for an account but have not received your confirmation email, please click here to resend.
Headquarters
Lindapter Internationalnews