Lindapter Girder Clamps provided a solution for securing steel framework to support heavy duty pipes.
Location: Selby, North Yorkshire, UK
Product: Type AF & Type A Girder Clamps
Market: Power Generation (other)
Client: REG Bio-Power
Whitemoor Power Station, located near Selby in North Yorkshire, has the capacity to provide 18 megawatts of electricity to the UK National Grid. The power plant is one of REG Bio-Power’s fleet of renewable energy generating stations in the UK and uses waste cooking oil to create a bioliquid, which is then burnt to produce eco-friendly energy.
Want to find out more about this product?
Watch the
installation video
How can we
help you?
Reasons to choose Lindapter
Save time and money
Clamping two steel sections together avoids time-consuming welding or conventional drilling and bolting.
Safer connections
Drilling and welding in the field is avoided, removing the need for hot work permits and encouraging safer site conditions.
High strength
Lindapter clamps are manufactured from high strength materials to resist high load requirements and harsh environments.
Industry leading approvals
Lindapter has earned a reputation synonymous with safety and reliability, gaining multiple independent approvals.
Adjustable
Quickly align steel sections by sliding the section into the correct position before tightening the Girder Clamp to complete the installation.
Free connection detailing
Lindapter’s experienced Engineers can detail a custom connection based on your specific requirements free of charge.
You must have a Lindapter account to access this content
Log in to your account
Register for an account
Don't have an account?
Click here to registerAlready registered?
If you have registered for an account but have not received your confirmation email, please click here to resend.
Headquarters
Lindapter Internationalnews