Lindapter Girder Clamps provided a solution for connecting cladding to a skybridge between two skyscrapers.
Location: Manhattan, New York City
Market: Steel Building Construction
Product: Type AAF Girder Clamps
Quantity: 600
Contractor: JDS Development Group
The American Copper Buildings is a luxury residential development which consists of an angled pair of copper-clad skyscrapers. The two structures which stand at 41 and 48 stories are located at 626 First Avenue, and contain a total of 761 luxury rental residences. The eye-catching buildings on the East River waterfront were designed by SHoP Architects and constructed by JDS Development.
During the early design stage it became apparent that planners would not allow the two buildings to be connected at grade due to zoning, and so the solution was to connect both towers with a skybridge 300 feet above ground level. Due to working at height, a drill and weld-free method of connecting a steel framework to underneath the skybridge trusses was required in order to attach cladding panels.
Lindapter Type AAF adjustable high slip resistance girder clamps with a combination of 5/8” and ¾” diameter grade A325 bolts were specified to connect the steel framework. The design incorporated a 4-bolt, 90o angle connection with steel location plates that avoided the need to drill or weld. Type AAF girder clamps also have a hot dip galvanized (HDG) finish which provides a high level of corrosion protection. The decision to use Lindapter Type AAFs was influenced by independent technical accreditations, which include ICC approval for structural and seismic design.
The contractor used over 600 Type AAF Girder Clamps to connect the steel framework to the main steel trusses of the 100 foot long skybridge. Installation was quick and easy as the steel beams were quickly aligned by sliding the beams into the correct position on each truss before tightening the clamp assembly.
The self-adjusting feature of the girder clamp was also beneficial as it allowed the contractor to use just one product on the whole project to suit the different flange thicknesses. Once tightened to the recommended torque the steel framework was securely connected to skybridge. To complete the installation cladding panels were attached to the steel framework.
Type AAF Girder Clamps provided a drilling and weld free connection that was quick and easy to install whilst working at height. The stunning three story skybridge now links the two buildings and surprisingly includes a fitness and leisure complex with a swimming pool on the bottom floor.
Want to find out more about this product?
Watch the
installation video
How can we
help you?
Reasons to choose Lindapter
Save time and money
Clamping two steel sections together avoids time-consuming welding or conventional drilling and bolting.
Safer connections
Drilling and welding in the field is avoided, removing the need for hot work permits and encouraging safer site conditions.
High strength
Lindapter clamps are manufactured from high strength materials to resist high load requirements and harsh environments.
Industry leading approvals
Lindapter has earned a reputation synonymous with safety and reliability, gaining multiple independent approvals.
Adjustable
Quickly align steel sections by sliding the section into the correct position before tightening the Girder Clamp to complete the installation.
Free connection detailing
Lindapter’s experienced Engineers can detail a custom connection based on your specific requirements free of charge.
You must have a Lindapter account to access this content
Log in to your account
Register for an account
Don't have an account?
Click here to registerAlready registered?
If you have registered for an account but have not received your confirmation email, please click here to resend.
Headquarters
Lindapter Internationalnews