About
Distributors
Contact
News
Login
Register
Home
Products
by Group
Steel Connections
Hollow Section (HSS) Connections
Concrete Decking Connections
Pipe / Conduit Supports
Steel Floor Connections
Rail Connections
Markets
Structural Engineering
Civil Engineering
Oil & Gas
Architectural
Materials Handling
Building Services
Bridges
Resources
Case Studies
go>
English
american
German
You are here:
Home
>
News
Products
Markets
Steel Connections
Hollow Section (HSS) Connections
Concrete Decking Connections
Pipe / Conduit Supports
Steel Floor Connections
Rail Connections
>
Structural Engineering
>
Civil Engineering
>
Oil & Gas
>
Architectural
>
Materials Handling
>
Building Services
>
Bridges
Latest News
Live Webinar Schedule 2021
Update Regarding Covid-19
New Catalog
ICC-ES Approved Girder Clamps
New Staff Update
NEW Case Study - CitizenM Hotel
Type CF Product Range Extension
Girder Clamps Secured The Purple People Bridge Walkway
Huge Success at Power-Gen
Girder Clamp Solution Avoided Costly Lead Abatement
Protecting Lindapter’s Intellectual Property
Comcast Technology Center
Extended Range of CE Marked Lindapter Connections
Lindapter Helped the Contractor to Win Shell Contracts
Hollo-Bolt was Specified for Structural Splice Connections
Continued Growth at Lindapter Leads to an Expansion
New Floor Connections Brochure by Lindapter
New Booklet for the Arts and Entertainment Industries
New Locomotive Plant Utilizes Lindapter Clamps
Lindapter's Clamps were used to Secure a Subsea Platform
Big Game, Big Video Screen Connections
Hollo-Bolt Gains LARR Approval
Hollo-Bolt Specified for 8-Story Façade Sculpture
Hollo-Bolts Used at Santa Clara's World-Class Stadium
Lindapter Type AAF was Specified for Sky-Pool Structure
Lindapter Hosted an Expansion Bolt Workshop at NASCC
Hollo-Bolt Gets Full Seismic Approval
Lindapter Launch Type ALP - Adjustable Lifting Point
Lindapter USA launch ‘all-in-one’ Girder Clamp
80 Years Pioneering Steel Connections
Hollo-Bolt HCF for Structural Connections
Clarity for Specifiers and Buyers
Lindapter Secures Target Field Canopy
Allerton Waste Recovery Park
Type AF Secures Production Riser 300ft below sea level
Hollo-Bolts used for Germany's Biggest Shopping Mall
One Manhattan Square
Hollo-Bolts were Specified for Cade Museum in Florida
Girder Clamps were Chosen for Securing Display Boards
New Specification Engineer for Western USA
Hollo-Bolt Secures Toulouse Airport Facade
Steel Contractor Doubles The Speed of Construction
Connections for Modular Construction
NEW Case Study - CitizenM Hotel
08/04/2016 10:13:16
Lindapter Hollo-Bolts provided a solution to the modular construction of this hotel in Seattle.
Download Full Case Study
Location:
South Lake Union, Seattle, Washington, USA
Product:
Hollo-Bolt® by Lindapter®
Quantity:
10,600
Project Value:
$50 million
Project Team:
Mortenson Construction, Gensler, Arup and Polcom
Project Background
Modular buildings, which are manufactured off-site in sections before being assembled in the field, are gaining popularity as an affordable and sustainable solution. This design and delivery method has been adopted by Netherlands-based hotel operator citizenM, who have brought their steel-framed modular hotels to New York and Los Angeles.
Client Requirement
Polcom Group, specialist off-site modular manufacturers, were appointed to build 228 modular units for the hotel. They identified that they would need to modify their normal production and assembly process to meet US building practices and standards. Due to time constraints the traditional method of connecting units together in the field by drilling and bolting was not chosen, whilst hot welding risked damaging the critical waterproof membrane that protects each module.
Design Solution
Special steel structural shear plates were designed and added to the steel enclosures of the modules during production so that they could be connected to each other with Lindapter Hollo-Bolts during assembly in the field.
Hollo-Bolt was specified for its high strength capacity and ability to be installed from one side of the Hollow Structural Section (HSS). To meet the required standards, manufacturing took place under the supervision of inspectors, including inspectors from the City of Seattle.
Each module was then wrapped in a protective air and water barrier, pressurized to keep windows in place and shipped on a private vessel from Europe, unloading at the Port of Everett in Seattle ready to be assembled.
Installation
Mortenson Construction were the appointed main contractor for the construction of this seven-story, 264-room hotel. Each 40,000lb modular unit was lifted by crane and carefully stacked on top of each other. Hexagonal head and countersunk Hollo-Bolts were then used to connect through the structural shear plates to the HSS of each module. Installation was quick and easy. Each bolt was inserted into pre-drilled holes and tightened with a calibrated torque wrench to the recommended tightening torque to provide the necessary clamping force.
Result
Hollo-Bolts provided a weld free connection that was quick and easy to install without damaging the waterproof membranes. This allowed the client to improve their modular construction method which provided many advantages over traditional methods, including shorter constructions schedules, consistent quality control and reduced disruption in the field.
"It’s about 4 months faster to do modular versus conventional, what would typically take about 17 months on a more traditional hotel, can be done in about 13 months when building modular."
Mortenson Construction Project Manager Lauren Boedeker
Hollo-Bolt Benefits
- Fast and convenient installation from one side
- No specialist equipment required to install
- No hot work permits or area closures required
- Unique high clamping force design
Click here to download the Hollo-Bolt datasheet.
TEXT SIZE:
A
/
A
/
A