You are here: Home > Case Studies > Ministry of Environment

Case Studies

Ministry of Environment

Sectors: Building Services
Applications: Installation of air conditioning

Summary: Lindapter Girder Clamps provided a solution for the installation of large air conditioning units on several roofs.

Download Full Case Study


Location:
Wiesbaden, Germany
Product: Type A & B Girder Clamps
Project Value: €19 million
Steel Contractor: Huhle-Stahlba

Project Background
The Hessian Ministry for the Environment, Climate Protection, Agriculture and Consumer Protection buildings were built in 1989. Following a recent evaluation the buildings were deemed to no longer meet current energy performance requirements, therefore the decision was made to comprehensively renovate and expand them.

Client Requirement
The client wanted to create highly energy efficient buildings by improving the performance of the façades and roofs in order to reduce energy consumption and CO2 emissions.

As part of the project a modern and efficient heating and ventilation system was required, including the installation of large air conditioning units to the roofs of the buildings. The challenge was to find a suitable method of connecting these units to the roofs, and one that was easy to install.

Design Solution
The engineers decided to add an extra floor to the buildings which would house the air conditioning units. The additional floors were designed using a steel framework that was sat on the loadbearing concrete columns and suspended above the existing roofs.

Lindapter Type A & B Girder Clamps in a four-bolt connection were specified to connect the steel beams together. This would provide a structure strong enough to support the weight of the large air conditioning units. A hot dip galvanised (HDG) finish was also specified to provide a high level of corrosion protection.

Installation
Steel beams were fixed on top of the structural concrete columns using upstands. Additional steel beams were then connected on top at 90o using a location plate and a four-bolt configuration consisting of Lindapter Type A and B clamps.

Installation was quick and easy as each bolt is simply inserted into the pre-drilled holes with the Type A holding the bolt captive while the nut on the Type B clamp is tightened with a torque wrench. The air conditioning units were then installed on the steelwork with all loads distributed to the structural columns.

Result
Lindapter Type A & B Girder Clamps provided a drilling and weld free connection onsite that wasquick and easy to install.

The clamps are fully adjustable which gave the contractor the ability during installation to manoeuvre the beams into their final positions before fully tightening them. Other improvements to the buildings included highly insulated façades with triple-glazed windows, integrated photovoltaic systems and planted elevations. All measures helped to improve the energy efficiency and reduce CO2 emissions.

Key Benefits
• Fully adjustable onsite for easy installation
• No drilling or welding required
• Hot Dip Galvanised finish offers a cost-effective and low maintenance solution

Click here to download the Type A datasheet.
Click here to download the Type B datasheet.

Watch our installation video below.